Project: Onshore Wind Energy
Client: Eneco, Renewable factory (REF)
Location: Heinenoord
Year: 2020 - 2022

Project description:

Windpark Oude maas consists of  5 wind turbines with a total capacity of 20 MVA. The windfarm is connected to the  13 kV grid of DSO Stedin with 2 substations, one by Eneco and one by  REF.

Activities of Energy Solutions:

Energy Solutions is responsible for the preliminary design, project specification  and support during the tender phase of the electrical infrastructure (substation and cables). During the execution phase of the project, energy solution provides supervision and quality control of the works.